Scope of work
Lower-impact installation across open routes
Conduit plowing places conduit or cable below grade while disturbing a narrower section of the surface than conventional trenching. On appropriate routes and soil conditions, the method can produce meaningful cost savings while maintaining installation production.
J-Mar reviews route access, required depth, material size, crossings, soil conditions, restoration requirements, and project specifications before determining where plowing fits the scope. Directional boring or excavation can be coordinated for crossings and areas that are not suitable for plowing.